SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:

Topic AreasTopic Details, Courses, BooksWeighting
Capacity Planning in SAP S/4HANAOutline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4230 (SAP S/4HANA 2020)

8% - 12%
Production Orders in SAP S/4HANADetermine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4225 (SAP S/4HANA 2020)

> 12%
Introduction to SAP S/4HANA Production PlanningOutline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

< 8%
Lean Manufacturing in SAP S/4HANAIdentify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

8% - 12%
Material Requirements Planning in SAP S/4HANASelect and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

8% - 12%
Introduction to SAP S/4HANA Supply Chain PlanningOutline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%
Demand Management in SAP S/4HANAExplain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

< 8%
Process Orders in SAP S/4HANACharacterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%
Master Data in SAP S/4HANAIdentify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4210 (SAP S/4HANA 2020)

> 12%


SAP S/4HANA Production Planning and Manufacturing Certification Exam Details:

Number of Questions80
Exam Price$550 (USD)
Duration180 mins
Schedule ExamSAP Training
Sample QuestionsSAP S/4HANA Production Planning and Manufacturing Certification Sample Questions
LevelAssociate
Passing ScoreC_TS422_2020 - 56%
C_TS422_1909 - 55%

 

NEW QUESTION 62
What are examples of assignment objects you can maintain in the Engineering Workbench?
There are 3 correct answers to this question.

  • A. Material to bill of materials (BOM) assignment
  • B. Material to production version assignment
  • C. Routing to sequence assignment
  • D. Material to routing assignment
  • E. Component assignment

Answer: A,D,E

 

NEW QUESTION 63
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Functional Location BOM
  • B. Class BOM
  • C. Sales Order BOM
  • D. Work Center BOM

Answer: A,C

 

NEW QUESTION 64
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.

  • A. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • B. Add the agreement to the quota arrangement and mark it for MRP relevance.
  • C. Add the agreement to the source list and mark itfor MRP relevance.
  • D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

Answer: A,C

 

NEW QUESTION 65
What is the difference between co-products and by-products?

  • A. Only co-products are identified by a special item category in the bill of material (BOM).
  • B. Only co-products appear in the processor production order settlement rule.
  • C. Onlyco-products can be manufactured in isolation from the main product.
  • D. Only by-products have a zero inventory valuation.

Answer: B

 

NEW QUESTION 66
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the bill of materials (BOM)
  • B. In the production version
  • C. In the routing
  • D. In the MRP controller
  • E. In the production order type

Answer: C,D,E

 

NEW QUESTION 67
A planner updated a production order status from partially confirmed "PCNF"to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?

  • A. The production manager can still see the capacity requirements
  • B. The production operator cannot enter additional confirmations
  • C. The buyer can still see component reservations
  • D. The warehouse clerk still carry out goods issue transactions

Answer: B

 

NEW QUESTION 68
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?

  • A. Finite resource and finite strategy
  • B. Infinite resource and infinite strategy
  • C. Infinite resource and finite strategy
  • D. Finite resource and infinite strategy

Answer: A

 

NEW QUESTION 69
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers tothis question.

  • A. Lot size
  • B. Maximum stock level
  • C. Purchase orders
  • D. Safety stock

Answer: A,D

 

NEW QUESTION 70
In which data objects do you maintain the production in as the work center for repetitive manufacturing?
There are 2 correct answers to this question.

  • A. Production version
  • B. Production cost collector
  • C. Repetitive manufacturing profile
  • D. Routing

Answer: A,D

 

NEW QUESTION 71
Which of the following functions can be performed when the production order has the status "Created" (CRTD)? Please choose the correct answer.

  • A. A user can trigger material staging via mass processing (transaction COHV).
  • B. A user can schedule a background job to release production orders (transaction COOIS).
  • C. A user trigger printing of shop floor paper manually (transaction CO02).
  • D. A user trigger material availability check via mass processing (transaction COHV)

Answer: A

 

NEW QUESTION 72
In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Production cost collector
  • C. Repetitive manufacturing profile
  • D. Routing

Answer: A,D

 

NEW QUESTION 73
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question.

  • A. SAP S/4AHANA Enterprise Management cloud
  • B. SAP S/4HANA Professional services cloud
  • C. SAP S/4HANA on premise
  • D. SAP S/4HANA private cloud

Answer: C,D

 

NEW QUESTION 74
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.

  • A. Production Version
  • B. Engineering Change Record
  • C. Bill of Material
  • D. Routing

Answer: A,C,D

 

NEW QUESTION 75
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Material
  • C. Plant
  • D. Work center

Answer: B,D

 

NEW QUESTION 76
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Picking list
  • B. Transfer Order
  • C. Kanban
  • D. Backflushing

Answer: A

 

NEW QUESTION 77
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When you create a sales order
  • B. When you create a planned order
  • C. When the MRP results are saved
  • D. When you deliver a sales order

Answer: A

 

NEW QUESTION 78
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • B. The lot size range must be within the lot-size range of the assigned routing.
  • C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • D. The assigned routing must NOT have alternative sequences.
  • E. The assigned routing must be a rate routing.

Answer: A,B,C

 

NEW QUESTION 79
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • B. MRP creates capacity requirements only if the work center has sufficient capacity.
  • C. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

Answer: D

 

NEW QUESTION 80
What are some of the advantages of using Kanban? There are 2 correct answers to this question.

  • A. Replenishments are created close to the actual need
  • B. It is a simplified form of production control
  • C. Replenishments are based on centralized planning
  • D. It is mostly accomplished by manual postings

Answer: A,B

 

NEW QUESTION 81
Your client is asking for your advice on material master numbering in SAP S/4HANA.
What do you need to consider? Note: There are 2 correct answers to this question.

  • A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • B. The number of leading zeros for internal numbers is client-specific.
  • C. The display template for material numbers applies to all clients.
  • D. In Customizing you can decide by material type whether to use the long material number.

Answer: A,C

 